Like Countable?

Install the App
TRY NOW

bill Progress


  • Not enacted
    The President has not signed this bill
  • The senate has not voted
  • The house has not voted
      house Committees
      House Committee on Transportation and Infrastructure
      Water Resources and Environment
      House Committee on Natural Resources
      Fisheries, Wildlife, Oceans and Insular Affairs
    IntroducedFebruary 14th, 2013

Bill Details

Official information provided by the Congressional Research Service. Learn more or make a suggestion.
The Congressional Research Service writes summaries for most legislation. These summaries are listed here. Countable will update some legislation with a revised summary, title or other key elements.

Suggest an update to this bill using our form.

Title

Upper Mississippi CARP Act

Official Title

To authorize the Secretary of the Army to take actions to manage the threat of Asian carp traveling up the Mississippi River in the State of Minnesota, and for other purposes.

Summary

Upper Mississippi Conservation and River Protection Act of 2013 or the Upper Mississippi CARP Act - Directs the Chief of Engineers to study the feasibility of: (1) temporarily closing the lock at the Upper St. Anthony Falls Lock and Dam (located on Mississippi River mile 853.9 in Minneapolis, Minnesota) to manage the threat of Asian carp traveling up the Mississippi River in Minnesota, and (2) implementing control measures at such lock and Lock and Dam 1 (located on Mississippi River mile 847.8 in Minneapolis, Minnesota), including permanently closing the locks, modifying lock operations, or using an alternative technology barrier, to manage such threat. Requires the Chief to assess the potential impacts, including environmental and economic impacts: (1) of temporary closure of such lock and of continuing to operate it, and (2) of implementing each of such control measures and of not implementing such measures. Authorizes the Chief to close such lock upon determining that closure is justified based on the assessment of potential impacts. Requires the Chief to close such lock upon determining that a live adult Asian carp has been captured above Lock and Dam 2 (located on Mississippi River mile 815.2 upstream of Hastings, Minnesota) or that a juvenile Asian carp has been captured above Lock and Dam 4 (located on Mississippi River mile 752.8 in Alma, Wisconsin). Authorizes the Secretary of the Interior, upon determining that an Asian carp has been captured at such a location, to transmit to the Chief a petition for closure of such lock. Allows the Chief to reopen the lock upon determining that adequate measures are in place to manage the threat. Directs the Council on Environmental Quality to incorporate the Upper Mississippi River and tributaries, the Minnesota River, and the St. Croix River into the Asian Carp Control Strategy Framework of the Council. Expresses the sense of Congress that federal agencies researching Asian carp control technologies should partner with state and local shareholders, giving priority to collaborative partnerships in which such shareholders contribute to the cost of the research.

    There are currently no opinions on this bill, be the first to add one!